District 94: Learning. Living. Leading.
|
West Chicago Community High School New Building TourEnjoy this tour of the remodeling and additions to West Chicago Community High School over the past few years made possible by our generous and supportive community!
Author: WCCHSD94TV
Length:
|
2014 - 2019
REPLACEMENT OF MECHANICAL SYSTEMS ($20.5M) Air conditioning/Air handlers Boilers/high efficiency boilers Cold, hot and hot water piping Cooling towers Fieldhouse air handlers Freight elevator replacement Heating hot water and chilled water pumps HVAC isolation valves Low fieldhouse roof Learning Resource Center roof Plumbing isolation valves Pool area roof Rooftop HVAC systems Sanitary and stormwater waste and vent piping Sound system replacement Stage lighting replacement Standby generator Temperature controls Water heat exchangers Water pressure booster pumps |
RENOVATION OF EXISTING SPACES ($8.4M) 1926 floor structure 1926/1955 building renovations 1926/1955 addition window replacement 1926/1955 addition LED lighting Auditorium lobby renovation Auditorium house lighting to LED Bishop gym bleacher replacement Cafeteria renovation completion Fieldhouse/pool clerestory window replacement Drama room and prop shop Football field turf replacement Learning Resource Center renovation Learning Resource Center window replacement Small gym bleacher replacement South tennis court reconstruction Track re-surfacing |
INCREASED INSTRUCTIONAL SPACE ($8.6M) |
June 10 - August 6, 2019 time-lapse video of exterior construction progress |